All of the Structural renovations have now been completed. The last of this stage was to repair a whole in the wall where the previous owners had cut a hole through the wall without doing it properly, they neglected to install a lental beam above the void thus nt supporting the wall above the doorway, this intern allowed the bricks above to collapse over time!!

So the guys at Leightal Constructions (my builders) have repaired it to how it should have been in the first place.  so now just on a week after the start of the structural stage has been completed, next week we start to have the services installed into the unit, ducted air conditioning, network wiring, electrical & plumbing, so that hopefully will be completed in a similar time frame maybe!!?? 

     